Current Tender

S. NO. Tender No. Date Published Tender Title Bid Submission End Date/Time Bid Opening Date/Time Details
1 086 27/03/2024 Part A: Execution of Major Maintenance works by Strengthening with DBM & BC Layers (MMR works) at various locations of service road at Pune Solapur Section of NH 9 from Km 144+400 to Km 249+000 in the State of Maharashtra
And Part B: Construction of service road at Market Yard (Km 251.600 to Km 252.015 LHS Service Road) & Shelgi Naka (Km 250.700 to Km 250.850 LHS service road) locations of Pune Solapur Section of NH 9 from Km 144+400 to Km 249+000 in the State of Maharashtra
Soft Copy 12-04-2024 (18:00 Hrs). Hard copy 15-04-2024 (18:00 Hrs) To be Informed at Later Date Details
2 085 04/03/2024 Repairing Work of Toll Plazas Buildings at KM 68 & Km 128 on Alwar-Sikandra (AS) roads in Rajasthan 26/03/2024 6.00 PM 27.03.2024 11.30 AM Details
3 084 04/03/2024 Supplying and Fixing of Road Signages & Other Road Safety Appurtenance including Thermoplastic Paint Road Marking on various roads in Rajasthan developed by RIDCOR (Package-3) 26/03/2024 6.00 PM 27.03.2024 11.30 AM Details
4 083 04/03/2024 Supplying and Fixing of Road Signages & Other Road Safety Appurtenance including Thermoplastic Paint Road Marking on various roads in Rajasthan developed by RIDCOR (Package-2) 26/03/2024 6.00 PM 27.03.2024 11.30 AM Details
5 082 04/03/2024 Supplying and Fixing of Road Signages & Other Road Safety Appurtenance including Thermoplastic Paint Road Marking on various roads in Rajasthan developed by RIDCOR (Package-1) 26/03/2024 6.00 PM 27.03.2024 11.30 AM Details
6 081 05/01/2024 Reinstatement of damaged Overhead Gantry at Ch:220+850 & Cantilever Gantry at Ch: 62+000 on Phalodi -Ramji Ki Gol (PR) roads in Rajasthan 18-01-2024 / 18:00 hrs 19-01-2024 Details
7 080 05/01/2024 Routine Maintenance Works on following stretches: Arjunsar-Pallu (AP) & Hanumangarh-Sangaria (HS) road in Rajasthan (Lot-12) 18-01-2024 / 18:00 hrs 19-01-2024 Details
8 079 05/01/2024 Routine Maintenance Works on Hanumangarh-Ratangarh (HK-1) road from Km 307 to Km 407 in Rajasthan (Lot-4) 18-01-2024 / 18:00 hrs 19-01-2024 Details
9 078 05/01/2024 Collection of User Fees and Operation of Toll Plaza along the Alwar-Sikandra Road (Package : AS) 18-01-2024 / 18:00 hrs 19-01-2024 Details
10 077 05/01/2024 Collection of User Fees and Operation of Toll Plaza along the Alwar-Bhiwadi Road (Package : AB) 18-01-2024 / 18:00 hrs 19-01-2024 Details
11 043 06/10/2023 Sale of Road Furniture and Other Scrap Assets on Assets on “AS IS WHERE IS BASIS” and “AS IS WHAT IS BASIS Lying at Various Project Sites Of Elsamex Maintenance Services Limited (EMSL) Soft Copy 18-10-2023 (23:59 Hrs) To be Informed at Later Date Details
12 042 27/09/2023 Upgradation of Existing State Highway-25 from 4-Lane to 6-Lane including construction of drain for the stretch between Tapukara (Km 212+800) to Bhiwadi (Km 221.350) in the state of Rajasthan 25/10/2023 (18:00 Hrs) 26/10/2023 Details
13 041 13/09/2023 Providing and Laying hot applied thermoplastic pavement markings as well as Supply and Installation of Road studs as per relevant IRC specifications at various locations between km 398.240 to km 521.120 in the States of Jharkhand and West Bengal Soft Copy 26-09-2023 (18:00 Hrs). Hard copy 28-09-2023 (18:00 Hrs) To be Informed at Later Date Details
14 040 07/09/2023 Design, Supply, Installation, Testing & Commissioning for LED Lighting works at various locations in Jharkhand section within km 398.240 to km 521.120 on Barwa Adda Panagarh Road Project Soft Copy 12-10-2023 (18:00 Hrs). Hard copy 16-10-2023 (18:00 Hrs) To be Informed at Later Date Details
15 039 08/07/2023 Supply & Installation of RetroReflective Signage & Gantry boards at various locations between km 398.240 to km 521.120 in the States of Jharkhand and West Bengal Soft Copy 22-07-2023 (18:00 Hrs) To be Informed at Later Date Details
16 038 10/05/2023 Repair & Rehabilitation of structures at Ch. Km 371+200, 382+900 & 350+500 on Hanumangarh-Ratangarh Road in Rajasthan 17/05/2023 (18:00 p.m.) 18/05/2023 Details
17 037 09/05/2023 Consultancy services for Preparation of Structural Safety Audit Report for Structures on RIDCOR/RIPL roads in the State of Rajasthan 15/05/2023 (18:00 p.m.) 16/05/2023 Details
18 036 29/04/2023 Execution of Major Maintenance Works by Milling of wearing course works and Strengthening of Slip Roads with WMM, DBM & BC Layers at Baleshwar Kharagpur Expressway Limited of NH-60 from Km 0+000 to Km 119+300 in the State of Odisha & West Bengal. Soft Copy 15-05-2023 (18:00 Hrs) To be Informed at Later Date Details
19 035 25/04/2023 Selection of Agency for Providing Manpower to Collect User Fee at toll plaza(s) along with Incident Management situated on various project roads developed by RIDCOR/RIPL in Rajasthan 08-05-2023 18.00 hrs 09-05-2023 11.30 hrs Details
20 034 21/03/2023 Supply, Installation, Testing & Commissioning for Lighting works at various locations within km 398.240 to km 521.120 on Barwa Adda Panagarh Road Project in the States of Jharkhand and West Bengal Soft Copy 25-03-2023 (18:00 Hrs) To be Informed at Later Date Details
21 033 03/11/2022 Execution of Balance Major Maintenance Works by Milling of Existing Road and Strengthening with DBM & BC Layers at Jorabat Shillong (Barapani) section of NH-40 from Km. 0.000 to Km 61.800 in the States of Assam and Meghalaya Soft Copy 05-12-2022 (18:00 Hrs) To be Informed at Later Date Details
22 032 28/10/2022 Execution of Routine Maintenance Works on Lalsot to Kota (LJ-1) (103Km to 188Km) roads in Rajasthan 11-11-2022 upto 18.00 hrs 14-11-2022 upto 11.00 hrs Details
23 031 28/10/2022 Execution of Routine Maintenance Works on following selected stretches of Baran-Jhalawar (Package: LJ-2), Jhalawar-Jhalawar Road (Package: JJ) and Jhalawar-Ujjain (upto State Border) (Package: JU) roads in Rajasthan 11-11-2022 upto 18.00 hrs 14-11-2022 upto 11.00 hrs Details
24 030 14/10/2022 Execution of Major Maintenance Works (Cycle-3) on following selected stretches of Baran-Jhalawar (Package: LJ-2), Jhalawar-Jhalawar Road (Package: JJ) and Jhalawar-Ujjain (upto State Border) (Package: JU) roads in Rajasthan 31-10-2022 (18:00 Hrs) 01-11-2022 (11:00 Hrs) Details
25 029 13/10/2022 Construction, Fabrication, Erection and Commissioning of Steel Foot over Bridges at various locations within km 398.240 to km 521.120 on Barwa Adda Panagarh Road Project in the States of Jharkhand and West Bengal”. (2nd call) Soft Copy 05-11-2022 18.00 hrs To be Informed at Later Date Details
26 028 30/09/2022 Sale of Road Furniture and Other Scrap Assets Lying at Various Project Sites Of Elsamex Maintenance Services Limited (EMSL) Soft Copy 15-11-2022 (22:00 Hrs) To be Informed at Later Date Details
27 027 19/09/2022 Construction, Fabrication, Erection & Commissioning of Steel FOBs (Foot Over Bridges) for the project at various stretches within km 398.240 to km 521.120 of Barwa Adda section in the States of Jharkhand and West Bengal Soft Copy 04-10-2022 (18:00 Hrs) To be Informed at Later Date Details
28 026 08/09/2022 Performance Based Execution of Routine Operation and Maintenance Works, Cleaning and Horticulture Works at Various Projects of EMSL on Soft Copy 16-09-2022 (22:00 Hrs) To be Informed at Later Date Details
29 025 25/08/2022 Execution of Pavement Marking with Hot Applied Thermoplastic Materials with Surface Application of Glass Beads at Specified Rate at Baleshwar Kharagpur Section of NH-60 from Km 0+000 to Km 119+300 in the State of Odisha & West Bengal Soft Copy 01-09-2022 (18:00 Hrs) To be Informed at Later Date Details