Main Tunnel |
: |
9kms (As per CA)
(9.200 Km - As per DPR & since Mountain face is 100mts more on both sides, the contractor also contemplating to start the tunnel from existing mountain face without any financial implications)
|
Escape Tunnel |
: |
9.200 Km |
Cross Passage |
: |
29 nos. |
Rigid Pavement |
: |
18.490Km (including main tunnel, escape tunnel and bridges) |
Flexible Pavement |
: |
1.800Km (four lane) |
Rotary Junction |
: |
02 Nos. |
Minor Bridge |
: |
2 nos. |
Culvert |
: |
07 Nos. Box Culvert |
Toll Plaza |
: |
02 Nos. |
Drainage pipe in Main tunnel |
: |
9.2 km (3 nos.) |
Drainage pipe in Escape tunnel |
: |
9.2 km (2 nos.) |
Drainage pipe in Cross passages |
: |
29 Nos. (On both the ends) |
Slope Protection works at Valley Side |
: |
1500 mts |
Slope Protection works at Hill Side |
: |
1760 mts |
Lay bays |
: |
12 nos. |
Fire fighting Niches |
: |
58 nos. |
Vehicular emergency exit |
: |
08 nos. |
Ventilation Building |
: |
02 nos. |
Tunnel Control Centre (Building) |
: |
02 nos. |